TECHNICAL OVERVIEW & APPLICATIONS
Traditional proppant transport relies on fluid viscosity and pumping rate, limited by reservoir damage and premature settling. Our Bubble-Suspended Proppant Technology enables full proppant suspension via adsorbed microbubble buoyancy, expanding propped fracture coverage and maximizing stimulated reservoir volume.
FEATURES & BENEFITS
Ultra-Far Transport Distance
Proppant transport distance into the deep fracture matrix is significantly increased by over 88%
Substantially Increased Propped Height
Effective proppant placement height within the fracture is expanded by 130%.
Excellent Proppant Flowback Inhibition
Due to the unique buoyant alignment and skeleton structure,proppant flowback phenomena are reduced by up to 98%.
Ultra-Low Viscosity Full Suspension
Achieves perfect suspension of full-mesh proppants (from 140 mesh to20 mesh) in low-to-medium viscosity slickwater (1–20 mPa·s), reducing chemical usage by over 50%
Ultra-Low Viscosity Full Suspension
In a fully-suspended state, onsite proppant concentration can reach up to 600kg/m³
Ultimate Reservoir Protection
Supports complete proppant suspension and transport in pure freshwaterbaselines, greatly enhancing stimulation results in fluid-sensitive reservoirs.
Case Study
In the side-by-side comparative application within the Southwest Oil & Gas Field, the test well using Bubble Suspended Proppant delivered outstanding reservoir stimulation and stable production capacity under steady operational conditions with a sand loading intensity of 3 t/m and a maximum sand concentration of 480 kg/m³. As of April 1, 2025, the well had achieved cumulative gas production of 38.42 million cubic meters with a pressure drawdown of only 5.27 MPa. The gas production per meter of pay thickness per unit pressure drawdown reached 6,775 cubic meters, and the EUR per kilometer was 104 million cubic meters. This provides solid field validation for the “bubble suspension + sand reduction & production enhancement” technology in low-permeability and tight gas reservoirs.
Bubble Suspended Proppant Enables Efficient Development of Southwest Oil & Gas Field: Field Demonstration of Sand Reduction and Production Enhancement
About Us
Corporate Culture
Join Us
Technical Solutions
Hydraulic Fracturing Technology Solution
Bubble Suspended Agent
Drilling Fluid&Nano Plugging Agent
QHSE
News
Contact Us
Address:Room 517, Zhiyuan Building, No.1 East Sanxian Road, Erxianqiao, Chenghua District, Chengdu, Sichuan Province, China
+(86)-028-83531126